Sunday, November 15, 2020

Week 17 - FYP report submission

 This week is the deadline to submit the final report and the logbook for FYP1. The report is based on the FYP1 template. The report was checked to avoid mistakes before submitting it. The logbook was done by using the Blogger website. After that, the report and the logbook link was sent to the FYP advisor via email.

Week 16 - Report draft submission

 The report draft is to be submitted to the FYP advisor this week. The plagiarism percentage of the report is not to be above 20%. After checking in TurnItIn website, the percentage was only 15%. The report draft is then submitted to sir Izwan to be checked. 


Week 15 - Report writing: Chapter 3

 For this week, I continued the report writing by doing Chapter 3: Methodology of the project. This chapter discusses the methodology of the RFID door lock with an alert system using GSM and the methods that will be applied to prepare this project. This chapter consists of a block diagram, project flowchart, schematic design, cost estimation, and Gantt chart. The flowchart is designed to show the project process flow.




Week 14 - Report writing: Chapter 2

 This week, I started writing Chapter 2: Literature Review of the project report. This chapter discuss the review of the RFID door lock with alert system using GSM, the effects of the project to the society and the existing methods that are related to the project. This chapter also include the background of alarm and door lock system, the reason to improve the current lock system and the main components of the project. The reviewed are from the journals chosen in week 10.

Week 13 - Improvement of project based on FYP defense

During the project defense day, the assessors gave comments to help improve the project. The improvements were made for the project objective. The new objectives are better than the previous objectives as it is more achievable.  The new objectives for the project are:
  1. To implement RFID and GSM in a door lock system.
  2. To design a door lock system with an alert notification.
  3. To develop a software code for a door lock system with RFID and GSM.

Week 12 - FYP project defense presentation

 For the FYP project defense presentation, the students are divided into groups. I was placed in group 6. The assessors are madam Norhaslinawati Bt Ramli and Dr. Zulkhairi B. Mohd Yusof. The presentation was done online via Microsoft Teams. After the presentation, there was a question and answer session. The questions were asked by the assessors based on the project of the students. The assessors also commented on the student's project to help improve the projects.

Week 11 - Slides preparation for FYP defense

 A week before the FYP1 proposal defense day, I prepared the presentation slides based on the research that is done. The slides are based on the rubric given by the FYP coordinators. The slides are a brief summary of the project to be done for FYP2. After finishing the presentation slides, I submitted the slide to my FYP advisor to check if there is any errors or improvements to be made. 

Week 17 - FYP report submission

 This week is the deadline to submit the final report and the logbook for FYP1. The report is based on the FYP1 template. The report was che...